Skip to content
Solar Farm Facts
- 563 kilowatt (kW) Solar photovoltaic (PV) System
- Online: October 2018
- Footprint: 3 acres Golden Valley Electric Association (GVEA) Solar Graphic
- Contractor: ABS Alaskan, Inc.
- Panel manufacturer: CSUN
- Each of the 1,760 panels will generate up to 320 watts.
- Contractor: ABS Alaskan, Inc.
- Cost: $850,000 after a $225,000 grant supplied from United States Department of Agriculture (USDA) Rural Energy for America Program (REAP)
- Annual energy production is estimated to equal the annual energy used in 71 homes (using an average of 660 kilowatt-hours (kWh) per month)
- Located on GVEA property next to BESS and Wilson Substation – Visible from VanHorn Road
工品汇
网络赌博平台
European-Cup-buy-ball-app-sales@shanzhai168.net
足球买球
European-Cup-buying-service@dianhanwang8.com
综艺秀
青川论坛
酒店旅游餐饮网
澳门威尼斯
Buy-ball-app-sales@mexillonwines.com
Hockey-Breakthrough-Deluxe-Edition-marketing@e2gou.com
洛阳欣欣旅游网
亚洲博彩
买球app
桂林人才网
福建协和医院
AG-sports-platform-help@manistationery.net
昆明理工大学津桥学院
克莉丝汀_官方商城
European-Cup-buying-media@zhekai.net
中央戏剧学院
神州学习网
重钢机械
窝窝团专卖店
《狩龙战纪》官方网站
郑州电力高等专科学校
莫高窟参观预约网
中国模特网
腰椎论坛
放放影院
17173QQ炫舞专区
万事通考试网
南都网
站点地图
搞笑视频